BIPV(BuildingIntegratedPhotovoltaic),即建筑光伏一體化,是一種將太陽(yáng)能發(fā)電設(shè)備集成到建筑和建材上的技術(shù),屬于分布式光伏電站的一種類型。長(zhǎng)期來(lái)看,在光伏建筑一體化領(lǐng)域,BIPV是確定性的發(fā)展方向。“天能瓦”三種BIPV屋頂解決方案:
BIPV (Building Integrated Photovoltaic), that is, building photovoltaic integration, is a technology that integrates solar power generation equipment into buildings and building materials, belonging to a type of distributed photovoltaic power station. In the long run, in the field of photovoltaic building integration, BIPV is a definite development direction. "Tianneng Tile" three BIPV roof solutions:
1、新建屋頂
1. New roof
新建鋼結(jié)構(gòu)廠房采用天能瓦壓型鋼板直接替代原設(shè)計(jì)彩鋼瓦,在設(shè)計(jì)時(shí)要求新增恒荷載18kg/m。
The new steel structure plant adopts the profiled steel plate of Tianneng tile to directly replace the original design color steel tile, and the new dead load of 18kg/m is required in the design.
施工工藝流程如下:施工準(zhǔn)備→材料供應(yīng)及驗(yàn)收→測(cè)量放線→天能瓦壓型鋼板下料地面分段預(yù)制→暗扣支座安裝→保溫層安裝→已預(yù)制壓型鋼板吊裝就位、安裝→屋面附屬設(shè)施施工→光伏系統(tǒng)安裝施工→垃圾清理外運(yùn)。
The construction process flow is as follows: construction preparation → material supply and acceptance → survey and setting out → Tianneng tile profiled steel plate blanking and ground section prefabrication → concealed support installation → insulation layer installation → prefabricated profiled steel plate hoisting and installation → roof ancillary facilities construction → photovoltaic system installation construction → garbage cleaning and transportation.
2、彩鋼瓦翻新
2. Color steel tile renovation
彩鋼瓦生銹的原因是受到環(huán)境、氣候等各種自然條件的影響,使彩鋼板銹蝕嚴(yán)重時(shí)會(huì)出現(xiàn)腐蝕銹穿孔洞,這時(shí)就需要翻新更換彩鋼瓦。更換彩鋼瓦時(shí)可采用天能瓦壓型鋼板直接用替代原有彩鋼瓦屋面。翻新前必須進(jìn)行承載驗(yàn)算,當(dāng)原有鋼結(jié)構(gòu)承載不滿足要求時(shí)必須加固后再安裝天能瓦壓型鋼板及光伏系統(tǒng)。
The reason why the color steel tile rusts is that it is affected by various natural conditions such as environment, climate, etc. When the color steel plate is seriously rusted, it will be corroded and rusted through the hole. At this time, the color steel tile needs to be renovated and replaced. When replacing color steel tile, Tianneng tile profiled steel plate can be directly used to replace the original color steel tile roof. Before renovation, the bearing check must be carried out. When the original steel structure does not meet the requirements, it must be reinforced before installing the Tianneng tile profiled steel plate and photovoltaic system.
施工工藝流程如下:施工準(zhǔn)備→材料供應(yīng)及驗(yàn)收→測(cè)量放線→天能瓦壓型鋼板下料地面分段預(yù)制→拆除舊屋面彩鋼瓦、保溫層及底座→暗扣支座安裝→保溫層安裝→已預(yù)制壓型鋼板吊裝就位、安裝→屋面附屬設(shè)施施工→光伏系統(tǒng)安裝施工→垃圾清理外運(yùn)。
The construction process flow is as follows: construction preparation → material supply and acceptance → survey and setting out → Tianneng tile profiled steel plate blanking and ground section prefabrication → removal of old roof color steel tile, insulation layer and base → installation of concealed support → installation of insulation layer → hoisting and installation of prefabricated profiled steel plate in place and installation → construction of roof auxiliary facilities → installation and construction of photovoltaic system → garbage removal and transportation.
天能瓦
3、覆蓋式安裝
3. Overlay installation
原彩鋼瓦屋面也可附加安裝一層天能瓦壓型鋼板。加裝前必須進(jìn)行承載驗(yàn)算,新增恒荷載25kg/m,當(dāng)原有鋼結(jié)構(gòu)承載不滿足要求時(shí)必須加固后再安裝天能瓦壓型鋼板及光伏系統(tǒng)。
The original color steel tile roof can also be additionally installed with a layer of Tianneng tile profiled steel plate. Before installation, the bearing check must be carried out, and the new dead load is 25kg/m. When the original steel structure does not meet the requirements, it must be reinforced before installing the Tianneng tile profiled steel plate and photovoltaic system.
施工工藝流程如下:施工準(zhǔn)備→材料供應(yīng)及驗(yàn)收→測(cè)量放線→天能瓦壓型鋼板下料地面分段預(yù)制→屋面新增天能瓦檁條安裝→屋面新增暗扣支座安裝→已預(yù)制壓型鋼板吊裝就位、安裝→屋面附屬設(shè)施施工→光伏系統(tǒng)安裝施工→垃圾清理外運(yùn)。
The construction process flow is as follows: construction preparation → material supply and acceptance → survey and setting out → Tianneng tile profiled steel plate blanking and ground section prefabrication → roof new Tianneng tile purlin installation → roof new concealed support installation → prefabricated profiled steel plate hoisting and installation → roof ancillary facilities construction → photovoltaic system installation construction → garbage cleaning and transportation.
天能瓦BIPV產(chǎn)品采用榫卯結(jié)構(gòu)和無(wú)導(dǎo)軌設(shè)計(jì),各個(gè)構(gòu)件之間的節(jié)點(diǎn)以榫卯相吻合,組成安全、緊固的框架體系,同時(shí)兼顧施工運(yùn)維的便利性,顯著減少施工環(huán)節(jié),節(jié)省支架和人力成本,因此,“天能瓦”具有更安全、更高收益、更快捷等主要優(yōu)勢(shì)。您有需求就來(lái)我們網(wǎng)站咨詢http://51lib.com.cn了解吧!
Tianneng tile BIPV products adopt tenon and tenon structure and no guide rail design. The joints between the components are dovetailed with tenon and tenon to form a safe and tight frame system. At the same time, taking into account the convenience of construction, operation and maintenance, significantly reducing construction links, saving support and labor costs. Therefore, "Tianneng tile" has the main advantages of safer, higher income, faster and so on. Come to our website for consultation if you need http://51lib.com.cn Understand!